Customer / Reference Site |
|
Scope Of Work |
|
|
|
Cement Industries of
Malaysia; Server Room |
|
Server Racks c/w
Installation |
|
|
Universiti Malaya; Dental
- OPAC |
|
To relocate Main Rack
to New location consist of 100 UTP Nodes / 2 x 6core
Multimode Fiber Optics, Equipment Racks |
|
|
JARING PWTC |
|
To supply, lay, install
and terminate 200 UTP Nodes |
|
|
Kementerian Perdagangan
Dalam Negeri |
|
Maintenance of Fire
Protection System |
|
|
Matshushita Television
(M) S/B |
|
Raised Access Floor
System |
|
|
Esso Tower (Thorn) |
|
To supply and install
Transformer Panels for BCS System |
|
|
Negeri Sembilan Cement
Industries; Server Room - Datacraft |
|
Raised Floor, Fire
Protection System, Air Conditioning System, Electrical
Works, Lightning Protection System & Security System |
|
|
Cement Industries M'sia;
Bukit Ketri Plant |
|
Raised Floor &
Electrical Works |
|
|
Universiti Malaya
|
|
Raised Floor, Fire
Protection System, Disaster Recovery Centre Air
Conditioning System, Electrical Works, Lightning
Protection System, Data & Security System |
|
|
Universiti Malaya |
|
To supply, lay, install
and Campus Wide terminate 1500 UTP Nodes, Patch Panel,
Equipment Racks & etc. |
|
|
ING Insurance; Menara
Boustead ( Level 23 ) |
|
To supply, lay, install
and terminate 100 UTP Nodes, Patch Panel, Equipment
Racks & etc. Outdoor Fiber Optic Cabling connecting
Menara ING to Menara Boustead using HDD underground
boring |
|
|
ING Insurance; Taman
Shemelin |
|
To supply, lay, install
and terminate 70 UTP Nodes, Patch Panel, Equipment Racks
& etc. |
|
|
ING Insurance; Menara
Boustead ( Level 3 ) |
|
To supply, lay, install
and terminate 70 UTP Nodes, Patch Panel, Equipment Racks
& etc. Horizontal Directional Drilling 1 way HDPE
ducting work ( Menara ING / Menara Boustead ) |
|
|
Universiti Malaya; Tangki
Air Project |
|
To supply, lay &
install Outdoor Fiber Optic Cabling connecting 2 Water
Tank to Control Centre |
|
|
Universiti Malaya
|
|
Sastera Baru, Fakulti
Bahasa & Linguastik, Bang Cad Cam (Eng), Kolej 2, 3, 4 &
7
To supply, lay & install Campus Single Mode Fibre
Project, To lay 1 x 12 Core Single-mode fiber optic
cable c/w splicing |
|
|
SS&C Technologies; Faber
Tower - Level 21 |
|
To supply, lay, install
and terminate 65 UTP Nodes, Equipment Racks, To lay 1 x
6 Core Multimode fiber optic cable c/w splicing,
Electrical Works, Air-Cond Works |
|
|
VPI Malaysia; Ipoh (Lembaga
Hasil)
|
|
To supply, lay, install
and terminate 500 UTP Nodes, Equipment Racks To lay 3 x
6 Core Multimode fibre optic cable c/w splicing Raised
Floor, Fire Protection System, Air Conditioning System,
Electrical Works, Lightning Protection System, &
Security System, 60 Kva UPS System |
|
|
VPI Malaysia; Subang (
Lembaga Hasil ) |
|
Raised Floor, Fire
Protection System, Air Conditioning System, Electrical
Works, Lightning Protection System, & Security System,
60 Kva UPS System. |
|
|
|