|
Customer / Reference Site |
|
Scope Of Work |
|
|
|
Thorn; KLIA - Security
System Commissioning |
|
Labour supply for
termination and testing commissioning |
|
|
Johnson Controls
Malaysia; TAMS Backbone |
|
Campus Wide BCMS
Package
To supply, lay, install, test commission Fiber Optic
Cable 4.5km Outdoor Fiber Optics |
|
|
Thorn; Kompleks
Antarabangsa |
|
Labour supply for
termination and testing commissioning |
|
|
Barber International;
45th Floor |
|
To supply, lay, install
and terminate 90 UTP Nodes Patch Panels, Equipment
Racks, etc. Voice & Data Integration |
|
|
Barber International;
58th Floor
|
|
To supply, lay, install
and terminate 150 UTP Nodes Patch Panels, Equipment
Racks, etc. Voice & Data Integration |
|
|
Tylon (M) Sdn Bhd |
|
To supply Twin axial
Cable complete with Connector |
|
|
Dragages Malaysia Berhad
|
|
To supply, lay, install
and terminate 50 UTP Nodes Patch Panels, Equipment
Racks, Hubs |
|
|
Alor Ria Sdn Bhd |
|
To supply, lay, install
and terminate 80 UTP Nodes, Patch Panels, Equipment
Racks, Hubs, Computers, etc. |
|
|
Dragages Malaysia Berhad
|
|
To supply, lay, install
and terminate 30 UTP/Tel Nodes, Patch Panels, Equipment
Racks |
|
|
Kuala Lumpur
International Airport Berhad |
|
TAMS Maintenance Centre
To supply, lay, install and terminate 58 UTP Nodes c/w
110 Block |
|
|
PIK Broadcast System
(IBC); Stadium Bukit Jalil |
|
To supply
telecommunication related products |
|
|
PIK Broadcast System
(IBC); Stadium Bukit Jalil |
|
To supply
telecommunication related products |
|
|
NIIT College; Ipoh |
|
To supply, lay, install
and terminate 78 UTP Nodes & Equipment Racks |
|
|
Permera Labels |
|
To supply, lay, install
and terminate 38 UTP/Tel Nodes & Equipment Racks |
|
|
Radio Wanita - RTM; 20th
Floor IGB Plaza |
|
To supply, lay, install
and terminate 90 UTP Nodes, Patch Panels, Equipment
Racks / Nitsuko PABX Voice & Data Integrated System |
|
|
MIMOS Berhad;
Semiconductor Lab - MISEM |
|
To supply, lay, install
and terminate UTP/Tel Nodes/Fiber, Patch Panels,
Equipment Racks |
|
|
MIMOS Berhad; RNC Lab
|
|
To supply, lay, install
and terminate UTP/Tel Nodes Patch Panels, Equipment
Racks |
|
|
Universiti Malaya; Asean
European Studies |
|
To supply, lay, install
and terminate UTP Nodes, Patch |
|
|
|