|
Customer / Reference Site |
|
Scope Of Work |
|
|
|
Kris Pahlawan
|
|
To supply, lay, install
and terminate 100 UTP Nodes Patch Panels, Equipment
Racks, etc. (Voice & Data Integrated) |
|
|
Asian Pac Holdings Bhd
|
|
Supply, lay, install &
terminate 100 UTP Nodes Patch Panels, Equipment Racks,
etc. |
|
|
NTT International
Malaysia |
|
Supply, lay, install &
terminate 100 UTP Nodes Patch Panels, Equipment Racks,
etc. |
|
|
Stacks Technologies Sdn
Bhd |
|
Supply, lay, install &
terminate 100 UTP Nodes Patch Panels, Equipment Racks,
etc. |
|
|
Qualitas Medical Mgnt
|
|
To supply, lay, install
and terminate 65 UTP Nodes Patch Panels, Equipment
Racks, |
|
|
S.J. Securities |
|
To supply, lay, install
and terminate 200 UTP Nodes. |
|
|
Toppan Moore Malaysia
|
|
Supply, lay, install &
terminate 50 UTP Nodes Patch Panels, Equipment Racks,
etc |
|
|
Labuan Maritime Services
|
|
To supply, lay, install
and terminate 60 UTP Nodes Patch Panels, Equipment
Racks, Keyphone, etc. (Level 17), Voice & Data
Integration System |
|
|
MFI Home Works |
|
To supply, lay, install
and terminate 70 UTP Nodes. |
|
|
Nitcom Holdings |
|
To supply, lay, install
and terminate 50 UTP Nodes |
|
|
KLIA Campus |
|
Security Devices
Installation |
|
|
JKR Headquarters (MCSB)
|
|
800 UTP Nodes, Outdoor
Fiber Ring Campus Wide and 16 Floors indoor Fiber
Backbone |
|
|
Kompleks Antarabangsa
|
|
4000 BMS Points (Comm
Cable) |
|
|
Esso Tower |
|
70 BMS Points (Comm
Cable) |
|
|
Golden Hope; (Carey
Island) |
|
Golden Hope Plantation
To supply and install RG58 Thin Ethernet as Backbone
|
|
|
Golden Hope; (Segamat) |
|
Golden Hope Plantation
To supply and install RG58 Thin Ethernet as Backbone
|
|
|
Golden Hope; (Tangkak) |
|
Golden Hope Plantation
To supply and install RG58 Thin Ethernet as Backbone
|
|
|
Golden Hope; Main Branch
- PNB Building |
|
To supply, lay, install
and terminate 20 UTP Nodes Patch Panels, Equipment
Racks, etc. |
|
|
|