| |
Customer / Reference Site |
|
Scope Of Work |
|
|
| |
Cement Industries of
Malaysia; Server Room |
|
Server Racks c/w
Installation |
| |
| |
SS&C Technologies; Faber
Tower - Level 19 |
|
To supply, lay, install
and terminate UTP (Voice / Data), Patch Panels Equipment
Racks |
| |
| |
KWSP ( Markora ); Jalan
Raja Chulan |
|
To supply, lay, install
and terminate UTP (Voice / Data), Patch Panels Equipment
Racks. Fibre optic backbone / 50 pair Cat3 backbone |
| |
| |
Megasteel (Nitcom);
Banting |
|
To supply, lay, install
and terminate 6 core outdoor fibre optic - 1km, Racks /
Switches |
| |
| |
JKR (Markora); HQ |
|
To supply, lay, install
and terminate UTP Nodes , Patch Panels Equipment Racks |
| |
| |
Universiti Malaya; Alam
Bina |
|
To relocate Main Rack
to New location consist of 100 UTP Nodes / 14 x 6core
Multimode Fiber Optics Equipment Racks |
| |
| |
Cement Industries of
Malaysia; Bahau Plant |
|
To supply, lay, install
and terminate 350 UTP Nodes, Patch Panels, Customized
Racks Indoor Fiber, Campus Wide 5km Outdoor Fiber, Fire
Protection System (Co2), Raised Floor, Air Condition
System |
| |
| |
Universiti Malaya; IPSP
|
|
To relocate Main Rack
to New location consist of 300 UTP Nodes / 12 x 12core
Multimode Fiber Optics, Equipment Racks |
| |
| |
Universiti Malaya; Dental
- MD3 |
|
To relocate Main Rack
to New location consist of 200 UTP Nodes / 5 x 6core
Multimode Fiber Optics, Equipment Racks |
| |
| |
Aetna Insurance Malaysia
(ING); |
|
Kuala Lumpur HQ,
Butterworth, Johor Baru, Penang, Klang, Damansara
Branches
To supply, lay, install and terminate UTP Nodes,
Telephone Nodes, Patch Panel, Equipment Racks & etc. |
| |
| |
Switchtech Malaysia
|
|
Installation of
Electrical wiring, Supply & install Air-Conditioning
System |
| |
| |
Agate Technologies
Malaysia |
|
Installation of
Electrical wiring |
| |
| |
UMW Toyota |
|
Installation of
Electrical wiring, Raised Floor System |
| |
| |
ISL Services |
|
Computer Room Site Prep |
| |
| |
KLCC (Thorn) |
|
To supply and install
BCS and |
| |
| |
KLIA Berhad; TAMS
Maintenance Centre |
|
Installation of
Electrical wiring |
| |
| |
Negeri Sembilan Cement
Industries Server Room - Datacraft |
|
Raised Floor, Fire
Protection System, Air Conditioning System, Electrical
Works, Lightning Protection System & Security System |
| |
| |
Cement Industries M'sia;
Bukit Ketri Plant |
|
Raised Floor &
Electrical Works |
| |
|
|
|
|